Project: BuckRV-8   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Buck Wyndham   -  
Project:   Vans - RV-8   -   VIEW REPORTS
Total Hours:3914.15
Start/Last Date:Jan 08, 2002 - No Finish Date
Engine:AeroSport Power IO-375-M1S
Propeller:Whirlwind 330-3B/72H-73 3-blade CS
Panel:G3X, G5, GTN650, GTR20, GTX45R, GMA245, GMC507
 
Friendly URL: https://eaabuilderslog.org?s=BuckRV-8

Home or Last Project Picture

Jul 05, 2008     Systems installation - (4.0 hours)       Category: Fuselage
Continued re-installing various systems and components:
-- Clamped the plastic anti-chafe covers into position where the cables exit the fuselage at the tail.
-- Riveted the aileron trim servo tray into the fuselage.
-- Installed the rudder cable forward attach clevises to the firewall.
-- Continued planning the routing of wiring harnesses forward and aft through the bulkheads.
-- Prepped lower longerons for installation of the flap actuator arm and attach blocks.
-- Attached fuel selector to its attach plate.
-- Shot a second coat of paint on various small components.
-- Finally, I pulled out and organized all the various bags of hardware that will be needed as the interior goes back together (Photo 3).


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.